CCNA EVE-NG
Free member

Hands-On Lab 5-3: Forwarding Decision with Two Switches – First Switch

Trace a unicast frame through the first of two switches and verify its uplink forwarding decision with Wireshark.

Lab Overview
  • Lab Number: 5-3
  • Lab Name: Forwarding Decision with Two Switches – First Switch
  • Lab Difficulty: Rated 4/10
  • Approximate Time: 45–60 minutes
  • Preferred Image: iol-l2 (Layer 2 Switch)
  • Lab on: Chapter 5: LAN Switching Concepts
  • Figure: 5-4 (Forwarding Decision with Two Switches: First Switch)
Objective

Simulate a multi-switch environment where a frame is forwarded through two switches. Configure Uplink links, verify connectivity, and use Wireshark to observe frame forwarding based on the MAC address table.

Scenario Description
0